Project Overview
This scope covers kitchen construction including layout, rough-in trades, cabinetry, surfaces, appliances, and finishing. Applicable to new construction, remodels, and additions.
Typical Projects Include:
- New kitchen in addition or new home
- Kitchen remodel with layout changes
- Kitchen update (cabinets and counters)
- Outdoor kitchen construction
- Kitchenette installation
- Kitchen expansion
Scope of Work
Planning & Rough-In
| Task | Description |
|---|---|
| Kitchen Design | Finalize the kitchen layout — cabinet placement, appliance locations, and workflow. |
| Demolition | Remove existing kitchen elements as needed. Protect adjacent spaces. |
| Rough Plumbing | Rough in water, drain, and gas lines per the kitchen plan. |
| Rough Electrical | Install circuits, outlet boxes, and lighting per the electrical plan and code. |
Construction
| Task | Description |
|---|---|
| Drywall & Paint | Finish drywall, prime, and paint walls and ceiling before cabinet installation. |
| Flooring | Install kitchen flooring (before or after cabinets depending on material type). |
| Cabinets | Install all kitchen cabinets. Level, plumb, and secure. Install hardware. |
| Countertops | Template, fabricate, and install countertops with all cutouts. |
Finishing
| Task | Description |
|---|---|
| Backsplash | Install backsplash tile. Grout and seal. |
| Fixture Installation | Install sink, faucet, disposal, dishwasher, and lighting fixtures. |
| Appliances | Install and connect all kitchen appliances. |
| Final Details | Install trim, touch up paint, and complete the punch list. |
Timeline & Milestones
Kitchen projects range from 2 weeks (cosmetic update) to 12+ weeks (full remodel with layout changes).
| Phase | Duration | Description |
|---|---|---|
| Planning & Rough-In | 2-4 weeks | Design, demo, plumbing, electrical, and inspections. |
| Construction | 3-6 weeks | Drywall, flooring, cabinets, and countertops. |
| Finishing | 1-3 weeks | Backsplash, fixtures, appliances, and punch list. |
Roles & Responsibilities
Homeowner
- •Finalize all selections before construction begins
- •Plan for temporary kitchen during construction
- •Be available for decisions and approvals
- •Process payments per the agreed schedule
Kitchen Contractor
- •Manage the project from design through completion
- •Coordinate all trades and inspections
- •Install or oversee all kitchen elements
- •Maintain quality and timeline
- •Complete punch list items
Materials & Equipment
Cabinetry
- •Wall and base cabinets
- •Pantry or specialty cabinets
- •Hardware (knobs, pulls)
- •Crown molding and trim
Surfaces
- •Countertop material
- •Backsplash tile
- •Flooring
- •Paint
Fixtures
- •Sink and faucet
- •Garbage disposal
- •Lighting fixtures
- •Appliance package
Quality Control Standards
Layout Execution
Finished kitchen matches the approved design — cabinet placement, appliance locations, and workflow.
Fit & Finish
Cabinets aligned, countertops fitted, tile grouted cleanly, and paint smooth.
Functionality
All plumbing, electrical, and appliances work correctly. No leaks, no trips.
Safety Protocols
Work Zone
Seal off the kitchen from living areas. Protect floors and walls from construction damage.
Utility Shutdown
Cap gas, water, and electrical before any demo or rough-in work.
Hazmat
Test older kitchens for lead and asbestos before demolition.
Project Documentation
- Signed contract and scope of work
- Kitchen design and layout
- Selection schedule with all finishes
- Permit and inspection records
- Change order log
- Appliance and product warranties
Financial Terms
Payment Structure
Kitchen projects use milestone-based payments tied to construction phases.
Terms & Conditions
- •Design deposit at signing
- •Payment at rough-in completion
- •Payment at cabinet installation
- •Payment at countertop installation
- •Final payment at project completion
- •Change orders in writing before work begins
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1Kitchen matches the approved design
- 2All cabinets and countertops installed properly
- 3Plumbing and electrical pass inspection
- 4Appliances installed and operational
- 5Backsplash and flooring complete
- 6Punch list addressed and signed off
Frequently Asked Questions
Ready to Use This Kitchen Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
Kitchen Remodel
Kitchen Remodel Scope of Work Template
View Template →Cabinet Installation
Cabinet Installation Scope of Work Template
View Template →Countertops
Countertops Scope of Work Template
View Template →Plumbing
Plumbing Scope of Work Template
View Template →Electrical
Electrical Scope of Work Template
View Template →Tile
Tile Scope of Work Template
View Template →