Project Overview
This scope covers a kitchen remodel including demolition, rough-in trades, cabinetry, countertops, flooring, backsplash, appliances, and finish work.
Typical Projects Include:
- Full kitchen gut and remodel
- Cabinet and countertop replacement
- Kitchen layout change
- Kitchen refresh (paint, hardware, backsplash)
- Galley kitchen conversion
- Open concept kitchen renovation
Scope of Work
Demo & Rough-In
| Task | Description |
|---|---|
| Kitchen Demo | Remove existing cabinets, countertops, backsplash, flooring, and fixtures. Protect adjacent areas. |
| Plumbing Rough-In | Move or add water, drain, and gas lines for the new kitchen layout. |
| Electrical Rough-In | Add circuits, move outlets, and install lighting boxes per the new plan. Bring kitchen up to code. |
| Framing & Drywall | Move or add walls as needed. Patch and finish drywall after rough-in inspections pass. |
Cabinets & Surfaces
| Task | Description |
|---|---|
| Cabinet Installation | Install wall and base cabinets per the layout. Level, plumb, and secure to studs. |
| Countertop Template & Install | Template countertops after cabinets. Fabricate and install countertops with sink and cooktop cutouts. |
| Backsplash | Install tile or other backsplash material. Grout and seal. |
| Flooring | Install new kitchen flooring — tile, LVP, hardwood, or other material. |
Finish & Closeout
| Task | Description |
|---|---|
| Plumbing Finish | Install sink, faucet, garbage disposal, dishwasher connection, and ice maker line. |
| Electrical Finish | Install outlets, switches, under-cabinet lighting, and pendant fixtures. |
| Appliance Installation | Deliver and install all kitchen appliances. Connect and test. |
| Punch & Walkthrough | Touch up paint, adjust hardware, and walk the finished kitchen with the homeowner. |
Timeline & Milestones
A full kitchen remodel typically takes 6-12 weeks. The sequence of trades is critical.
| Phase | Duration | Description |
|---|---|---|
| Demo & Rough-In | 2-3 weeks | Demo, plumbing, electrical, framing, and drywall. |
| Cabinets & Surfaces | 3-5 weeks | Cabinets, countertop template/install, backsplash, and flooring. |
| Finish & Closeout | 1-2 weeks | Fixtures, appliances, paint, and punch list. |
Roles & Responsibilities
Homeowner
- •Make all selections on time (cabinets, counters, tile, fixtures, appliances)
- •Provide access and plan for a temporary kitchen
- •Make decisions promptly to avoid delays
- •Process payments per the agreed schedule
Contractor
- •Manage the project schedule and trade sequence
- •Pull permits and coordinate inspections
- •Install or coordinate all work per the plan
- •Maintain a clean and safe work area
- •Walk the homeowner through completion
Materials & Equipment
Cabinets & Counters
- •Kitchen cabinets (wall and base)
- •Countertop material (granite, quartz, etc.)
- •Cabinet hardware
- •Under-cabinet lighting
Surfaces
- •Backsplash tile and grout
- •Flooring material
- •Paint and primer
- •Trim and molding
Fixtures & Appliances
- •Kitchen sink and faucet
- •Garbage disposal
- •Range, refrigerator, dishwasher
- •Range hood or microwave
Quality Control Standards
Cabinet Alignment
All cabinets level, plumb, and aligned. Doors and drawers operate smoothly.
Countertop Fit
Countertops fit properly with clean seams, correct overhang, and accurate cutouts.
Code Compliance
Plumbing, electrical, and framing meet current building code. Inspections passed.
Safety Protocols
Dust Control
Seal off the kitchen from living areas during demo and construction. Use dust barriers.
Utility Safety
Turn off water, gas, and electrical before disconnecting any kitchen systems.
Lead & Asbestos
Test for lead and asbestos in older homes before demolition begins.
Project Documentation
- Signed contract and scope of work
- Kitchen design and layout
- Selection schedule (cabinets, counters, tile, fixtures)
- Permit and inspection records
- Change order log
- Warranty information for all products
Financial Terms
Payment Structure
Kitchen remodels use milestone payments tied to project phases.
Terms & Conditions
- •Deposit due at contract signing (typically 10-20%)
- •Payment at demo completion
- •Payment at cabinet installation
- •Payment at countertop installation
- •Final payment after punch list completion
- •Change orders require written approval before work proceeds
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1All cabinets installed per layout and operating smoothly
- 2Countertops installed with clean seams and proper fit
- 3Backsplash and flooring installed per specification
- 4All plumbing and electrical working and inspected
- 5Appliances installed, connected, and tested
- 6Punch list completed and signed off
Frequently Asked Questions
Ready to Use This Kitchen Remodel Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
Kitchen
Kitchen Scope of Work Template
View Template →Cabinet Installation
Cabinet Installation Scope of Work Template
View Template →Countertops
Countertops Scope of Work Template
View Template →Plumbing
Plumbing Scope of Work Template
View Template →Electrical
Electrical Scope of Work Template
View Template →General Contractor
General Contractor Scope of Work Template
View Template →