Project Overview
This scope covers countertop installation including templating, fabrication, delivery, installation, sink cutouts, and sealing. Applicable to kitchens, bathrooms, and other countertop applications.
Typical Projects Include:
- Kitchen countertop replacement
- New construction countertops
- Bathroom vanity top
- Kitchen island countertop
- Outdoor kitchen countertop
- Commercial bar or reception counter
Scope of Work
Template & Fabrication
| Task | Description |
|---|---|
| Material Selection | Select slab material, color, and edge profile. Visit the slab yard to pick specific slabs if applicable. |
| Templating | Template the countertop on site using digital laser or physical templates. Note sink, cooktop, and faucet locations. |
| Fabrication | Cut, shape, and polish the countertop at the fabrication shop. Create sink cutouts and edge profiles. |
| Quality Check | Inspect fabricated pieces before delivery. Verify dimensions, cutouts, and edge profile. |
Installation
| Task | Description |
|---|---|
| Delivery | Deliver fabricated countertop pieces to the job site. Protect doorways and flooring during transport. |
| Setting | Set countertop pieces on cabinets. Level and secure with adhesive and brackets. |
| Seam Work | Join multi-piece countertops with color-matched epoxy. Minimize seam visibility. |
| Cutout Finishing | Verify all sink, cooktop, and faucet cutouts are correct. Polish edges of cutouts. |
Finishing
| Task | Description |
|---|---|
| Backsplash | Install backsplash pieces if included (stone backsplash, not tile). Set and caulk to wall. |
| Sealing | Seal natural stone countertops (granite, marble). Quartz and solid surface don't require sealing. |
| Plumbing Hookup | Note: plumber reconnects sink and faucet after countertop installation (usually not in countertop scope). |
| Walkthrough | Walk the project with the client. Inspect edges, seams, and overall fit. |
Timeline & Milestones
Countertop projects take 2-4 weeks from template to installation. Fabrication is the longest phase.
| Phase | Duration | Description |
|---|---|---|
| Template | 1 day | On-site templating after cabinets are installed. |
| Fabrication | 1-3 weeks | Cutting, shaping, and polishing at the shop. |
| Installation | 1 day | Delivery, setting, seaming, and finishing. |
Roles & Responsibilities
Property Owner / GC
- •Select material, color, and edge profile
- •Ensure cabinets are fully installed and level before templating
- •Coordinate plumbing disconnection before install
- •Process payments per the agreed schedule
Countertop Contractor
- •Template on site
- •Fabricate countertop to specifications
- •Deliver and install countertop
- •Seal natural stone (if applicable)
- •Clean up and walk the project
Materials & Equipment
Countertop Material
- •Stone slab (granite, quartz, marble, quartzite)
- •Solid surface (Corian or similar)
- •Butcher block
- •Edge profile tooling
Installation
- •Color-matched epoxy for seams
- •Silicone adhesive
- •Support brackets (for overhangs)
- •Plywood subtop (for certain applications)
Tools
- •CNC or bridge saw
- •Router for edge profiles
- •Polishing pads
- •Suction cups for handling
Quality Control Standards
Fit
Countertop fits the cabinet layout with consistent overhang and tight wall contact.
Seams
Seams are tight, level, and color-matched. Minimal visibility from normal viewing distance.
Edge Quality
Edge profile is consistent and fully polished with no chips or rough spots.
Safety Protocols
Heavy Material
Stone slabs are extremely heavy. Use proper lifting equipment and enough crew to handle safely.
Silica Dust
Cut stone in the shop with wet saws to control silica dust. Follow OSHA silica standards.
Transport
Secure slabs properly during transport. Protect doorways and walls during delivery.
Project Documentation
- Signed contract and scope of work
- Slab selection confirmation
- Template drawing with dimensions
- Edge profile selection
- Sealer product information (natural stone)
- Warranty and care instructions
Financial Terms
Payment Structure
Countertop projects are typically billed with a deposit at order, with balance due at installation.
Terms & Conditions
- •Deposit due at contract signing (typically 50%)
- •Balance due on installation day
- •Material cost is usually per square foot (varies widely by stone type)
- •Sink cutouts, edge profiles, and backsplash may be additional
- •Changes after templating may require re-fabrication at additional cost
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1Countertop fits cabinets with proper overhang
- 2Seams tight and color-matched
- 3Edge profile matches selection throughout
- 4All cutouts in correct locations
- 5Natural stone sealed (if applicable)
- 6Surface clean and free of fabrication marks
Frequently Asked Questions
Ready to Use This Countertops Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
Cabinet Installation
Cabinet Installation Scope of Work Template
View Template →Kitchen Remodel
Kitchen Remodel Scope of Work Template
View Template →Plumbing
Plumbing Scope of Work Template
View Template →Tile
Tile Scope of Work Template
View Template →Bathroom Remodel
Bathroom Remodel Scope of Work Template
View Template →General Contractor
General Contractor Scope of Work Template
View Template →