Cabinet Installation Scope of Work Template

Download a free cabinet installation scope of work template. Covers delivery, layout, installation, hardware, and trim for cabinet installers.

Download Free Template

Cabinet Installation Scope of Work Template
Download:

What's Included

Cabinet installation is detail work — everything needs to be level, plumb, and aligned. A scope of work defines what's being installed, who provides what, and how the finished kitchen or bath should look. This template covers cabinet delivery, layout, installation, hardware, and trim. It works for kitchens, bathrooms, and built-ins. Customize it for your project.

Project Overview

This scope covers cabinet installation including receiving, layout verification, wall and base cabinet installation, hardware, and trim. Applicable to kitchens, bathrooms, laundry rooms, and built-in cabinetry.

Typical Projects Include:

  • Kitchen cabinet installation
  • Bathroom vanity installation
  • Laundry room cabinets
  • Garage storage cabinets
  • Built-in bookcase or entertainment center
  • Cabinet refacing or replacement

Scope of Work

Receiving & Prep

TaskDescription
Delivery InspectionReceive cabinets and inspect for damage. Report any issues to the supplier immediately.
Layout VerificationVerify wall measurements match the cabinet layout. Mark stud locations and cabinet positions on the wall.
Wall PrepEnsure walls are flat and patched. Install backing or blocking for upper cabinets if not already in place.
Utility CoordinationConfirm plumbing, electrical, and appliance rough-ins are in the correct locations for the cabinet layout.

Installation

TaskDescription
Upper CabinetsInstall upper (wall) cabinets first. Level, plumb, and secure to studs. Shim as needed.
Base CabinetsInstall base cabinets. Level across the run and shim to account for uneven floors.
Specialty CabinetsInstall corner cabinets, pantry cabinets, and any specialty units per the layout.
Fillers & PanelsInstall filler strips, end panels, and decorative panels per the design.

Finish & Details

TaskDescription
Doors & DrawersInstall and adjust all doors and drawer fronts. Ensure consistent gaps and alignment.
HardwareInstall pulls, knobs, and hinges. Template all hardware for consistent placement.
Crown & TrimInstall crown molding, light rail, and trim pieces per the design.
Final AdjustmentMake final adjustments to doors, drawers, and hardware. Walk with client.

Timeline & Milestones

Cabinet installation typically takes 2-5 days depending on the kitchen size and complexity.

PhaseDurationDescription
Receiving & Prep0.5-1 dayDelivery inspection, layout check, and wall prep.
Installation1-3 daysUpper and base cabinet installation.
Finish & Details1-2 daysDoors, hardware, crown, and final adjustments.

Roles & Responsibilities

Property Owner / GC

  • Order cabinets and ensure delivery before install date
  • Ensure walls are ready (painted, flat, studs marked)
  • Provide access and clear workspace
  • Process payments per the agreed schedule

Cabinet Installer

  • Inspect cabinets at delivery
  • Install all cabinets level, plumb, and per layout
  • Install doors, drawers, and hardware
  • Install crown and trim
  • Make final adjustments

Materials & Equipment

Cabinets

  • Wall cabinets
  • Base cabinets
  • Specialty cabinets (corners, pantry)
  • Filler strips and end panels

Hardware & Trim

  • Pulls, knobs, and hinges
  • Crown molding
  • Light rail and trim
  • Cabinet screws and shims

Tools

  • Level (4-foot and torpedo)
  • Clamps
  • Drill and impact driver
  • Miter saw for crown and trim

Quality Control Standards

Level & Plumb

All cabinets are level and plumb. Uppers align across the run, bases are level front to back and side to side.

Door Alignment

All doors are aligned with consistent gaps. No rubbing, sticking, or misalignment.

Secure Mounting

Every cabinet is secured to wall studs — not just drywall. No movement or racking.

Safety Protocols

Lifting

Upper cabinets are heavy — use a cabinet jack or two-person lift. Don't try to hold and screw alone.

Tool Safety

Use proper PPE with saws and drills. Keep work area clean to prevent trips.

Electrical Awareness

Know where wiring runs before drilling into walls. Turn off circuits in the work area.

Project Documentation

  • Signed contract and scope of work
  • Cabinet layout drawing
  • Cabinet order and packing list
  • Damage report (if applicable)
  • Hardware placement template
  • Warranty information

Financial Terms

Payment Structure

Cabinet installation labor is typically billed as a flat fee or per cabinet, separate from cabinet cost.

Terms & Conditions

  • Deposit due at scheduling
  • Final payment due after installation and walkthrough
  • Cabinet purchase is typically separate from installation labor
  • Additional work (crown, trim, modifications) may be extra
  • Damage claims must be filed with the cabinet supplier

Acceptance Criteria & Sign-Off

The project is considered complete when the following criteria are met:

  • 1All cabinets installed per the approved layout
  • 2Level and plumb throughout the installation
  • 3Doors and drawers operate smoothly with consistent gaps
  • 4Hardware installed at consistent heights and positions
  • 5Crown and trim installed cleanly
  • 6No damaged cabinets in the finished installation