Getting cabinets right is one of the most important parts of any kitchen or bathroom project. The scope of work defines what cabinets are included, who installs them, what hardware goes on, and what the finished product should look like. This template covers cabinet selection, delivery, installation, and finishing. It's straightforward and works for any cabinet project. Adjust it for your specific job.

Project Overview

This scope covers cabinet supply and installation including selection, ordering, delivery, installation, hardware, and trim work.

Typical Projects Include:

  • Kitchen cabinet replacement
  • New construction kitchen cabinets
  • Bathroom vanity cabinets
  • Pantry or utility cabinets
  • Garage or workshop cabinets
  • Cabinet door and hardware replacement

Scope of Work

Selection & Ordering

TaskDescription
MeasurementsMeasure the space accurately. Document window, door, outlet, and plumbing locations.
Cabinet SelectionSelect cabinet line, door style, color/finish, and interior options with the client.
Layout DrawingCreate a cabinet layout showing every cabinet, its size, and position.
Order PlacementPlace the order with the supplier. Confirm lead time and delivery date.

Installation

TaskDescription
Delivery & InspectionReceive delivery and inspect all cabinets against the order. Report damage immediately.
Upper Cabinet InstallInstall wall cabinets first. Secure to studs, level and plumb, shim as needed.
Base Cabinet InstallInstall base cabinets. Level front-to-back and side-to-side across the entire run.
Fillers & PanelsInstall filler strips between cabinets and walls. Install end panels and decorative pieces.

Finishing Touches

TaskDescription
Doors & DrawersInstall and adjust all doors and drawers for consistent alignment and smooth operation.
HardwareInstall knobs, pulls, and any soft-close mechanisms.
Crown & TrimInstall crown molding, light rail, and toe kick boards.
WalkthroughWalk the finished project with the client and make any final adjustments.

Timeline & Milestones

Cabinet lead time is typically 2-8 weeks depending on the brand. Installation takes 2-5 days.

PhaseDurationDescription
Selection & Order1-2 weeksMeasurements, selections, and ordering.
Lead Time2-8 weeksCabinet manufacturing and delivery.
Installation2-5 daysInstallation, hardware, and trim.

Roles & Responsibilities

Property Owner

  • Make selections and approve layout
  • Ensure space is ready for installation
  • Be available for delivery coordination
  • Process payments per the agreed schedule

Cabinet Contractor

  • Take accurate measurements
  • Create layout and place order
  • Receive and inspect cabinets
  • Install cabinets, hardware, and trim
  • Walk the project and make final adjustments

Materials & Equipment

Cabinets

  • Upper (wall) cabinets
  • Base cabinets
  • Tall/pantry cabinets
  • Specialty units (corners, lazy susans)

Accessories

  • Door and drawer hardware
  • Interior organizers and pull-outs
  • Crown molding and trim
  • End panels and fillers

Installation Hardware

  • Cabinet screws
  • Shims
  • Clamps
  • Level

Quality Control Standards

Level & Plumb

All cabinets level and plumb. Upper cabinets aligned. Base cabinets level across the run.

Smooth Operation

All doors and drawers open and close smoothly with no sticking or misalignment.

Consistent Gaps

Even spacing between doors and drawers throughout the installation.

Safety Protocols

Heavy Lifting

Use a cabinet jack or helper for wall cabinets. Don't try to solo-hang uppers.

Electrical Safety

Turn off power before drilling near outlets. Know where wiring runs behind the walls.

Clean Workspace

Keep the work area clean and organized to prevent trips and falls.

Project Documentation

  • Signed contract and scope of work
  • Cabinet layout drawing
  • Order confirmation with quantities and sizes
  • Delivery receipt and damage report
  • Hardware selections
  • Warranty documentation

Financial Terms

Payment Structure

Cabinet projects typically split between material cost and installation labor.

Terms & Conditions

  • Design/measurement deposit at signing
  • Cabinet material deposit at order (typically 50%)
  • Material balance due before delivery
  • Installation payment due after completion
  • Changes after order may incur restocking fees

Acceptance Criteria & Sign-Off

The project is considered complete when the following criteria are met:

  • 1All cabinets installed per the approved layout
  • 2Level, plumb, and securely mounted to studs
  • 3Doors and drawers aligned and operating smoothly
  • 4Hardware installed consistently
  • 5Crown and trim completed
  • 6No damage to finished cabinets