Project Overview
This scope covers window installation including product selection, removal of old windows, new window installation, flashing, and trim work.
Typical Projects Include:
- New construction window installation
- Window replacement project
- Energy efficiency upgrade
- Specialty window (bay, bow, skylight)
- Window repair or reglazing
- Historic window restoration
Scope of Work
Selection & Prep
| Task | Description |
|---|---|
| Window Selection | Select window brand, style, material (vinyl, wood, fiberglass), and glass package (low-E, argon, triple-pane). |
| Measurements | Measure every window opening precisely. Custom sizes require exact measurements. |
| Old Window Removal | Remove existing windows and trim. Protect interior from weather during the changeover. |
| Opening Prep | Clean, repair, and flash the rough opening. Correct any out-of-square or rot issues. |
Installation
| Task | Description |
|---|---|
| Window Setting | Set each window in the opening, shim for level and plumb, and verify operation before fastening. |
| Securing | Fasten the window per manufacturer instructions. Don't over-tighten — the frame should not bow. |
| Weatherproofing | Seal the window with flashing tape, caulk, and low-expansion foam. Integrate with house wrap. |
| Hardware & Screens | Install all hardware, locks, and screens. Verify all operating features work. |
Trim & Completion
| Task | Description |
|---|---|
| Exterior Finish | Install exterior casing, brick mold, or integrate with siding. Caulk all joints. |
| Interior Finish | Install interior casing, extension jambs, stool, and apron. |
| Cleanup | Clean glass, remove protective films, and clean up all debris. |
| Owner Demo | Demonstrate window operation — tilt, clean, lock — and provide warranty documentation. |
Timeline & Milestones
Window installation is typically fast once windows arrive. Most homes are completed in 1-3 days.
| Phase | Duration | Description |
|---|---|---|
| Selection & Order | 1-2 weeks | Measurements, selection, and ordering. |
| Lead Time | 3-6 weeks | Window manufacturing and delivery. |
| Installation | 1-3 days | Removal, installation, trim, and cleanup. |
Roles & Responsibilities
Property Owner
- •Select window style, material, and features
- •Clear interior window areas
- •Be available for the installation day
- •Process payments per the agreed schedule
Window Installer
- •Take accurate measurements
- •Order correct windows
- •Install all windows weathertight
- •Install trim and finish
- •Demonstrate window features
Materials & Equipment
Windows
- •Window units (specified brand and style)
- •Screens and hardware
- •Extension jambs (if needed)
- •Trim and casing
Weatherproofing
- •Flashing tape
- •Low-expansion spray foam
- •Exterior caulk
- •House wrap tape
Tools
- •Level and shims
- •Pry bar and reciprocating saw
- •Caulking gun
- •Drill and finish nailer
Quality Control Standards
Airtight
No drafts or air leaks around any window. Foam and caulk seal continuous.
Smooth Operation
Every window opens, closes, locks, and tilts without sticking or excessive force.
Proper Flashing
Flashing sheds water away from the opening — no reverse laps or gaps.
Safety Protocols
Glass Safety
Handle windows carefully — broken glass causes serious injuries. Wear gloves.
Height Work
Use ladders and scaffolding safely for upper-story installations.
Weather Exposure
Have tarps ready to cover open window openings if weather changes during installation.
Project Documentation
- Signed contract and scope of work
- Window schedule with sizes and options
- Product specifications and NFRC ratings
- Installation photos
- Manufacturer warranty
- ENERGY STAR certification
Financial Terms
Payment Structure
Window projects require deposits due to custom sizing and manufacturing lead times.
Terms & Conditions
- •Deposit at contract signing (typically 50%)
- •Balance due at installation completion
- •Custom windows are non-refundable once ordered
- •Frame repair is a change order
- •Financing options may be available
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1All windows installed level, plumb, and centered
- 2Weatherproofing complete — no drafts or leaks
- 3All windows operate correctly
- 4Interior and exterior trim installed
- 5Glass clean and protective films removed
- 6Warranty documentation provided
Frequently Asked Questions
Ready to Use This Windows Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
Window Replacement
Window Replacement Scope of Work Template
View Template →Siding Installation
Siding Installation Scope of Work Template
View Template →Flashing
Flashing Scope of Work Template
View Template →Painting
Painting Scope of Work Template
View Template →Finish Carpentry
Finish Carpentry Scope of Work Template
View Template →General Contractor
General Contractor Scope of Work Template
View Template →