Project Overview
This scope covers siding installation including old siding removal, house wrap, siding installation, and trim. Applicable to residential and commercial exterior cladding projects.
Typical Projects Include:
- Whole-house siding replacement
- Vinyl siding installation
- Fiber cement (HardiePlank) installation
- Wood or cedar siding
- Partial siding repair
- New construction siding
Scope of Work
Removal & Prep
| Task | Description |
|---|---|
| Old Siding Removal | Remove existing siding, trim, and accessories. Dispose of debris. |
| Sheathing Inspection | Inspect wall sheathing for damage, rot, or soft spots. Replace as needed. |
| House Wrap | Install or repair house wrap (weather-resistive barrier). Tape all seams and integrate with window and door flashing. |
| Furring & Prep | Install furring strips or rain screen if specified. Prep the surface for siding attachment. |
Siding Installation
| Task | Description |
|---|---|
| Starter Strip | Install starter strip level along the bottom of the wall. |
| Siding Panels | Install siding panels from bottom to top. Maintain proper overlap, nailing, and expansion gaps. |
| Corners & Trim | Install inside corners, outside corners, J-channel, and window/door trim. |
| Soffits & Fascia | Install soffit panels and fascia boards (if in scope). Ensure proper ventilation at soffits. |
Details & Cleanup
| Task | Description |
|---|---|
| Caulking | Caulk around windows, doors, and penetrations with compatible, paintable sealant. |
| Touch-Up | Touch up any paint or finish on cut ends (fiber cement). Install final trim pieces. |
| Cleanup | Remove all debris, old siding, and nails from the property. Leave the site clean. |
| Walkthrough | Walk the completed siding with the homeowner. Check alignment, trim, and overall appearance. |
Timeline & Milestones
Most residential siding projects take 1-3 weeks depending on house size and siding type.
| Phase | Duration | Description |
|---|---|---|
| Removal & Prep | 2-4 days | Old siding removal, sheathing repair, and house wrap. |
| Siding Installation | 3-8 days | Siding, trim, corners, and soffits. |
| Details & Cleanup | 1-2 days | Caulking, touch-up, and cleanup. |
Roles & Responsibilities
Property Owner
- •Select siding type, color, and trim style
- •Move items away from the exterior walls
- •Provide access to all sides of the house
- •Process payments per the agreed schedule
Siding Contractor
- •Remove old siding and repair sheathing
- •Install house wrap and siding per manufacturer specs
- •Install all trim, corners, and accessories
- •Caulk and seal all penetrations
- •Clean up and walk the project
Materials & Equipment
Siding
- •Siding panels (vinyl, fiber cement, wood)
- •Starter strip
- •J-channel and utility trim
- •Inside and outside corners
Prep
- •House wrap
- •House wrap tape
- •Flashing (window, door, kick-out)
- •Sheathing (for repairs)
Equipment
- •Circular saw or siding cutter
- •Nail gun (for fiber cement/wood)
- •Scaffolding or ladders
- •Caulking guns
Quality Control Standards
Level & Straight
Siding courses are level and straight across each wall. No waves or bowing.
Proper Nailing
Nails centered in slots (vinyl) or per manufacturer nailing pattern. Not too tight — siding must expand.
Weather Barrier
House wrap is continuous with taped seams and proper integration with window and door flashing.
Safety Protocols
Fall Protection
Use scaffolding or ladders safely. Fall protection for work above 6 feet.
Cutting Safety
Wear eye and hearing protection when cutting siding. Use dust control for fiber cement.
Lead Paint
Test for lead paint on homes built before 1978 before removing old siding. Follow EPA RRP Rule.
Project Documentation
- Signed contract and scope of work
- Siding product and color selection
- House wrap installation photos
- Building permit (if required)
- Manufacturer warranty information
- Before and after photos
Financial Terms
Payment Structure
Siding projects are typically billed with milestone payments.
Terms & Conditions
- •Deposit due at contract signing (typically 30-40%)
- •Progress payment after removal and house wrap
- •Final payment after siding installation and cleanup
- •Sheathing repair is a change order
- •Material cost fluctuation clauses may apply
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1Siding installed level and straight on all walls
- 2Trim and corners installed cleanly
- 3House wrap intact with taped seams
- 4All penetrations caulked and sealed
- 5Soffits and fascia installed (if in scope)
- 6Property cleaned of all debris
Frequently Asked Questions
Ready to Use This Siding Installation Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
Roofing
Roofing Scope of Work Template
View Template →Window Replacement
Window Replacement Scope of Work Template
View Template →Painting
Painting Scope of Work Template
View Template →Flashing
Flashing Scope of Work Template
View Template →Insulation
Insulation Scope of Work Template
View Template →General Contractor
General Contractor Scope of Work Template
View Template →