Project Overview
This scope covers retail build-out work including demolition of existing finishes, framing, MEP rough-ins, finishes, fixture installation, and final punch list for tenant improvement projects.
Typical Projects Include:
- New tenant build-out in strip mall
- Restaurant-to-retail conversion
- Storefront renovation
- Retail space refresh or rebrand
- Pop-up shop build-out
- Multi-unit retail center fit-out
Scope of Work
Pre-Construction & Demo
| Task | Description |
|---|---|
| Site Survey | Measure the space, verify existing conditions, and confirm the floor plan matches the drawings. |
| Demolition | Remove existing finishes, fixtures, and non-structural elements as needed to prepare the space. |
| Permits | Pull building permits and coordinate plan review with the local jurisdiction. |
| Utility Coordination | Confirm existing utility capacity and coordinate new service if needed — electrical panel, gas, water, sewer. |
Construction
| Task | Description |
|---|---|
| Framing & Drywall | Build out interior walls, soffits, and bulkheads per the approved floor plan. |
| MEP Rough-Ins | Rough in electrical, plumbing, and HVAC to serve the new layout. Includes data and low voltage. |
| Storefront & Entrance | Install or modify the storefront system, entry doors, and ADA-compliant hardware. |
| Finishes | Install flooring, paint, ceiling grid, wall coverings, and trim throughout the space. |
Fixtures & Closeout
| Task | Description |
|---|---|
| Fixture Installation | Install display fixtures, shelving, counters, POS stations, and any built-in millwork. |
| Signage | Install interior and exterior signage per landlord and municipality requirements. |
| Final Inspections | Schedule and pass all required inspections — building, fire, health, and ADA. |
| Punch List & Turnover | Walk the space with the tenant, complete punch list items, and hand over keys. |
Timeline & Milestones
Retail build-out timelines depend on size, complexity, and permitting. A basic space can be done in weeks; a complex build-out may take months.
| Phase | Duration | Description |
|---|---|---|
| Pre-Construction | 1-3 weeks | Permitting, demolition, and utility coordination. |
| Construction | 3-8 weeks | Framing, MEP rough-ins, finishes, and inspections. |
| Fixtures & Closeout | 1-2 weeks | Fixture installation, signage, punch list, and turnover. |
Roles & Responsibilities
Tenant / Property Owner
- •Provide approved floor plan and design intent
- •Secure landlord approvals and lease requirements
- •Coordinate fixture procurement and delivery schedule
- •Process payments per the agreed schedule
Build-Out Contractor
- •Pull permits and manage inspections
- •Coordinate all trades — framing, MEP, finishes
- •Maintain the construction schedule
- •Deliver a punch-list-free space at turnover
- •Ensure compliance with ADA and building codes
Materials & Equipment
Structure & Finishes
- •Metal studs and drywall
- •Ceiling grid and tile
- •Flooring materials (LVP, tile, polished concrete)
- •Paint and wall coverings
MEP
- •Electrical panels and wiring
- •Plumbing fixtures and piping
- •HVAC units and ductwork
- •Low-voltage cabling and data drops
Fixtures & Signage
- •Display fixtures and shelving
- •POS counters and millwork
- •Interior and exterior signage
- •ADA-compliant hardware
Quality Control Standards
Code Compliance
All work passes local building, fire, and ADA inspections without re-inspection.
Finish Quality
Paint, flooring, and trim are installed cleanly with no visible defects or damage.
Schedule Adherence
Work stays on schedule to meet the tenant's opening date.
Safety Protocols
Occupied Building
If adjacent tenants are open, maintain dust barriers and control noise during business hours.
Fire Safety
Maintain clear egress paths and fire extinguisher access throughout construction.
PPE
Hard hats, safety glasses, gloves, and steel-toe boots required on site at all times.
Project Documentation
- Signed contract and scope of work
- Approved floor plan and design drawings
- Building permit
- Inspection records
- Change orders
- Completion photos and punch list sign-off
Financial Terms
Payment Structure
Retail build-outs are typically paid in progress draws tied to milestones.
Terms & Conditions
- •Deposit due at contract signing (typically 20-30%)
- •Progress payments at framing, rough-in, and finishes milestones
- •Final payment due after punch list completion and turnover
- •Change orders for tenant-requested changes or unforeseen conditions
- •Payment due within 30 days of invoice
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1All work matches the approved floor plan and design intent
- 2Building, fire, and ADA inspections passed
- 3Punch list items completed
- 4Space is clean and ready for tenant move-in
- 5All permits closed out
- 6Keys and documentation handed over to tenant
Frequently Asked Questions
Ready to Use This Retail Build-Out Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
Demolition
Demolition Scope of Work Template
View Template →Electrical
Electrical Scope of Work Template
View Template →Plumbing
Plumbing Scope of Work Template
View Template →HVAC
HVAC Scope of Work Template
View Template →Flooring
Flooring Scope of Work Template
View Template →Drywall
Drywall Scope of Work Template
View Template →