Subcontractor Scope of Work Template

Download a free subcontractor scope of work template. Covers trade-specific deliverables, scheduling, coordination with the GC, payment terms, and closeout.

Download Free Template

Subcontractor Scope of Work Template
Download:

What's Included

When you hire a sub without a clear scope, you're setting yourself up for arguments about what was and wasn't included. A subcontractor scope of work spells out exactly what the sub is responsible for — and just as importantly, what they're not. This template works for any trade. It defines the sub's deliverables, schedule requirements, coordination responsibilities, and payment terms. Whether you're a GC writing scopes for your subs or a sub putting your own agreement together, this covers the essentials. Fill in the trade-specific details and you've got a solid agreement that keeps everyone on the same page.

Project Overview

This scope covers subcontractor work including trade-specific deliverables, material procurement, schedule coordination with the general contractor, site cleanup, and project closeout.

Typical Projects Include:

  • Residential new construction trade packages
  • Commercial tenant improvement trade work
  • Renovation subcontract work
  • Multi-family construction trade packages
  • Specialty installation contracts
  • Service and repair subcontracts

Scope of Work

Mobilization & Coordination

TaskDescription
Pre-Construction MeetingAttend the pre-con meeting with the GC. Review plans, schedule, site rules, and coordination requirements.
Material ProcurementOrder and deliver all materials required for the scope. Confirm lead times with the GC.
Schedule CoordinationProvide crew and complete work within the GC's master schedule. Communicate delays immediately.
Site LogisticsFollow the GC's site rules for parking, staging, dumpster use, and work hours.

Trade Work Execution

TaskDescription
Rough-In WorkComplete all rough-in work per plans and specs. Coordinate with other trades for shared spaces.
InspectionsSchedule and pass all required inspections for the trade. Correct any deficiencies promptly.
Finish WorkInstall all finish materials and trim. Protect completed work from damage by other trades.
Quality StandardsAll work must meet manufacturer specs, building code, and the project's quality standards.

Cleanup & Closeout

TaskDescription
Daily CleanupClean the work area at the end of each day. Remove debris and keep the site safe.
Punch ListComplete all punch list items within the agreed timeframe. No exceptions.
Warranty DocumentationProvide product warranties, as-built markups, and any required closeout documentation.
Lien WaiverSubmit conditional and unconditional lien waivers with each pay application.

Timeline & Milestones

Subcontractor timelines are driven by the GC's master schedule. The sub must hit their windows or risk holding up the entire project.

PhaseDurationDescription
Mobilization1-5 daysMaterial delivery, staging, and crew mobilization.
Trade WorkVaries by tradeRough-in through finish work, including inspections.
Closeout1-5 daysPunch list completion, cleanup, and documentation turnover.

Roles & Responsibilities

General Contractor

  • Provide complete plans and specifications
  • Maintain the master schedule and coordinate trade sequencing
  • Provide site access, power, and water
  • Process pay applications within the agreed timeframe

Subcontractor

  • Furnish all labor, materials, and equipment for the scope
  • Complete work per plans, specs, and schedule
  • Maintain proper insurance and licensing
  • Clean up daily and complete punch list items promptly
  • Submit lien waivers with each payment request

Materials & Equipment

Trade Materials

  • All materials specified in the plans and specs
  • Fasteners, adhesives, and consumables
  • Manufacturer-approved accessories and components

Tools & Equipment

  • All trade-specific tools and equipment
  • Lifts, scaffolding, or ladders as needed
  • Personal protective equipment for the crew

Documentation

  • Submittals and shop drawings
  • Material safety data sheets
  • Product warranties and spec sheets

Quality Control Standards

Plan Compliance

Work matches the approved plans, specs, and any approved submittals exactly.

Code Compliance

All work meets local building codes and passes required inspections.

Manufacturer Standards

Materials are installed per manufacturer instructions to maintain warranty coverage.

Safety Protocols

Site Safety Rules

Follow the GC's site-specific safety plan. Attend all required safety meetings.

PPE

All crew members wear required PPE at all times — hard hats, safety glasses, gloves, and proper footwear.

Housekeeping

Keep the work area clean and free of tripping hazards. Secure tools and materials at the end of each day.

Project Documentation

  • Signed subcontract agreement
  • Scope of work
  • Insurance certificates
  • Submittals and shop drawings
  • Pay applications and lien waivers
  • Punch list
  • Warranty documentation

Financial Terms

Payment Structure

Subcontractors are typically paid monthly based on progress, with retainage held until the work is fully complete.

Terms & Conditions

  • Progress payments submitted monthly with the GC's pay cycle
  • Retainage of 5-10% held until punch list completion
  • Conditional lien waiver submitted with each pay application
  • Unconditional lien waiver submitted upon receipt of payment
  • Change orders must be approved in writing before work begins

Acceptance Criteria & Sign-Off

The project is considered complete when the following criteria are met:

  • 1All trade work completed per plans and specifications
  • 2All inspections passed
  • 3Punch list items completed
  • 4Work area cleaned
  • 5Closeout documents submitted
  • 6Final lien waiver provided