Commercial Roofing Scope of Work Template

Download a free commercial roofing scope of work template. Covers flat roof membranes, TPO, EPDM, metal, and built-up roofing for commercial roofers.

Download Free Template

Commercial Roofing Scope of Work Template
Download:

What's Included

Commercial roofing has different systems, different warranties, and different stakes than residential. A scope of work defines the system, the detail work, and how the building stays protected during the project. This template covers membrane, metal, and built-up roofing systems. It works for new installations, re-roofs, and repairs. Customize it for your project and system type.

Project Overview

This scope covers commercial roofing including membrane installation, flashing, penetration details, edge metal, and warranty. Applicable to flat, low-slope, and steep-slope commercial projects.

Typical Projects Include:

  • TPO or PVC membrane installation
  • EPDM rubber roof
  • Built-up roofing (BUR)
  • Modified bitumen roof
  • Standing seam metal roof
  • Commercial roof repair or coating

Scope of Work

Prep & Tear-Off

TaskDescription
Roof SurveySurvey the existing roof — document conditions, drains, curbs, penetrations, and problem areas.
Tear-OffRemove existing roofing membrane and insulation down to the deck (or overlay if specified).
Deck RepairInspect and repair the roof deck. Replace damaged sections of metal, concrete, or wood deck.
StagingSet up material staging, crane access, and safety perimeters.

Installation

TaskDescription
InsulationInstall roof insulation and tapered insulation system for proper drainage to roof drains.
MembraneInstall roofing membrane (TPO, PVC, EPDM, or modified bitumen) per manufacturer specifications.
Flashing & DetailsFlash all curbs, penetrations, drains, scuppers, and wall transitions with compatible materials.
Edge MetalInstall edge metal, coping, and gravel stops at all roof perimeters.

Closeout

TaskDescription
Quality InspectionInspect all seams, flashing, and details. Test welds and seams per manufacturer requirements.
Drainage TestVerify positive drainage to all roof drains. No ponding water after 48 hours.
CleanupRemove all debris, staging, and equipment. Clean drains and gutters.
WarrantySchedule manufacturer inspection (if required for NDL warranty). Submit warranty application.

Timeline & Milestones

Commercial roofing timelines depend on building size. Most projects take 1-4 weeks.

PhaseDurationDescription
Prep & Tear-Off2-5 daysTear-off, deck repair, and staging.
Installation5-15 daysInsulation, membrane, flashing, and edge metal.
Closeout2-3 daysInspection, testing, cleanup, and warranty.

Roles & Responsibilities

Building Owner / Property Manager

  • Provide roof access and building information
  • Coordinate with building occupants about noise and disruption
  • Approve the roofing system and warranty level
  • Process payments per the agreed schedule

Commercial Roofing Contractor

  • Survey the existing roof and develop a scope
  • Pull permits and coordinate inspections
  • Install the roofing system per manufacturer specifications
  • Obtain manufacturer warranty on behalf of the owner
  • Provide maintenance recommendations

Materials & Equipment

Membrane

  • TPO, PVC, EPDM, or modified bitumen membrane
  • Membrane adhesive or fasteners
  • Seam tape or welding equipment
  • Flashing membrane

Insulation

  • Polyiso insulation boards
  • Tapered insulation for drainage
  • Cover board
  • Insulation fasteners

Accessories

  • Edge metal and coping
  • Roof drains and scuppers
  • Pipe boots and curb flashing
  • Walkway pads

Quality Control Standards

Seam Integrity

All membrane seams fully welded or adhered per manufacturer specifications. No open seams.

Positive Drainage

Roof drains properly with no ponding water 48 hours after rain.

Manufacturer Compliance

Installation meets manufacturer requirements for NDL (No Dollar Limit) warranty eligibility.

Safety Protocols

Fall Protection

Perimeter warning lines, guardrails, or personal fall arrest systems required on all commercial roofs.

Hot Work

Follow hot work permit procedures when using torches for modified bitumen or hot asphalt.

Weather Monitoring

Monitor weather conditions. Secure open roof areas before storms. No membrane installation in wet conditions.

Project Documentation

  • Signed contract and scope of work
  • Roof survey and core sample results
  • System specification and shop drawings
  • Daily progress reports
  • Seam test results
  • Manufacturer warranty certificate

Financial Terms

Payment Structure

Commercial roofing projects use milestone payments tied to project progress.

Terms & Conditions

  • Deposit due at contract signing (typically 20-30%)
  • Payment at 50% completion
  • Payment at substantial completion
  • Retainage held until warranty is issued (typically 5-10%)
  • Change orders for deck repair and unforeseen conditions

Acceptance Criteria & Sign-Off

The project is considered complete when the following criteria are met:

  • 1Membrane installed per manufacturer specifications
  • 2All seams tested and verified
  • 3Flashing complete at all penetrations and transitions
  • 4Positive drainage confirmed
  • 5Edge metal and coping installed
  • 6Manufacturer warranty issued